ARMY TM 10-1670-281-23&P
AIR FORCE T.O. 13C5-32-2
NAVY NAVAIR 13-1-32
(d) Extend the running end of the suspension lines to the upper right comer of the stowage panel
and for the first suspension line stow by making a loop in the suspension lines aligned with
the edge of the locking slot flap. Secure the suspension line stow with the first installed
webbing length. Make the tie with a surgeon's knot and locking knot
(e) Extend the suspension lines to the upper left comer of the stowage panel. Form and secure
the second suspension line stow by making a loop in the suspension line stow as outlined in
step (d), above (figure 2-95.5S. Continue to stow and secure the remaining suspension lines
alternating from right to left
Figure 2-95.5. First and Second Suspension Line Stowed, G-12E
Change 4
2-98.5