TM 10-1670-286-20
EXTRACTION LINE PANEL PROCEDURES FOR C-17 GLOBEMASTER III 0016 00
STOWING THE 140-FOOT THREE LOOP EXTRACTION LINE TO THE EXTRACTION
LINE PANEL WITH EXTRACTION BRIDLE ATTACHED
0016 00-7
j. Ensure that the running end of the extraction line extends approximately 16-18 feet from the top
left corner of the top panel. Secure to 12th stow loop left side with one turn type I, ¼-inch cotton
webbing (figure 9).
Figure 9. Extraction Line Stowed to Top Panel.
4. Close Extraction Line Bag.
a. Place a 36 x 38-inch sheet of kraft paper (line separator) on top of stowed extraction line of
bottom panel (figure 10).
Figure 10. Line Separator in Place.
b. Fold top panel onto bottom panel and kraft paper (line separator). Align with upper edge of bottom
panel.
NOTE
Insure extraction line stows do not shift out of position.
c. Cut one 95-inch length of ½-inch tubular nylon. Cut one 95-inch length and six 10-inch lengths of
type I, ¼- inch cotton webbing to be used as bag closing ties.
16-18-Feet
Remaining
12th Stow Loop Tie
Left Side
Line Separator
Top Panel
Extraction Line