TM 10-1670-286-20
EXTRACTION LINE PANEL PROCEDURES FOR C-17 GLOBEMASTER III 0016 00
STOWING THE 140-FOOT THREE LOOP EXTRACTION LINE TO THE EXTRACTION
LINE PANEL WITH EXTRACTION BRIDLE ATTACHED
0016 00-6
right side). Ensure cotton muslin runs the entire length of the panel.
g. Secure the extraction line on the left side of bottom panel using one turn type I, ¼-inch cotton
webbing (previously installed), on stow loops 1, 6, and 12 on the left side (figure 7).
Figure 7. Extraction Line Stowed to Bottom Panel.
h. Route extraction line to the lower left side of the top panel. Make the first line tie on the bottom
left corner of top panel. Make the second line tie on the bottom middle of the top panel and make
the third line tie and the first regular stow on the bottom right corner of the top panel (figure 8).
Figure 8. Extraction Line Tied to Top Panel with First Stow.
i. Working from left to right, stow and secure remaining extraction line. Make seven stows on the
right side and five stows on the left side of the top panel. Make and secure extraction line stows with
type I, ¼-inch cotton webbing making positive ties on the right, center and left stow loops.
Top Panel
Stow Ties
Left Side
Extraction Line
First Stow,
Top Panel
2nd and 3rd Line Tie
Top Panel
