TM10-1670-286-20
EXTRACTION LINE PANEL PROCEDURES FOR C-17 GLOBEMASTER III 0018 00
STOWING 120/140-FOOT SIX LOOP EXTRACTION LINE TO EXTRACTION
LINE PANEL WITH EXTRACTION LINE BRIDLE ATTACHED
0018 00-6
Stow Loop Ties 1, 6,
and 12
Figure 7. Extraction Line Stowed to Bottom Panel.
f. Run the extraction line up the left side of bottom panel. Wrap the extraction line with second
piece of cotton muslin cloth and secure in five places with two turns single type I, ¼-inch cotton
webbing (same as the right side).
g. Secure the extraction line on the left side of bottom panel using one turn type I, ¼-inch cotton
webbing (previously installed), on stow loops 1, 6, and 12 on the left side.
h. Route extraction line to the lower left side of the top panel. Make first line tie in bottom left
corner of top panel (figure 8).
Figure 8. Extraction Line Routed to Left Side of Bottom Panel.
i. Working from left to right, stow and secure remaining extraction line. Make seven stows on the
right side and six stows on the left side of the top panel. Secure extraction line stows with type I,
¼-inch cotton webbing making positive ties on the right, center, and left stow loops.
8 Stows
Extraction Line,
Lower Left
1st Stow