TM 10-1670-293-23&P
0011 00
0011 00-51
Change 1
2. Make entries on the Jump, Inspection and Repack Data page, as follows:
a. Date. Enter the day, month and year of each packing action.
b. Bag Number. Entry made in the Tying Connector Links and Suspension Line
Protective Cover paragraph, step 5, above.
c. Routine inspection. No entry required.
d. Jumps or dropped. No entry required.
e. Repack. For initial packing, enter IN; thereafter, enter a checkmark in the column
each time the parachute is repacked.
f.
Packers name. The packer performing the packing will sign this entry.
g. Inspectors name. The inspector who has performed the pack-in-process
inspection will sign this entry.
h. Unit. Enter the unit designation to which the packer and/or inspector is assigned.
3. Return the log record to the log record pocket upon completion of the entries. Packing is now
completed.