TM 10-1670-293-23&P
0006 00
0006 00-5
Table 1. Preventive Maintenance Checks and Services (PMCS) - Continued.
B Before
D During
A - After
INTERVAL
ITEM
NO.
B
D
A
ITEM TO BE
INSPECTED
PROCEDURES
05
*
*
Deployment
Bag
Inspect all webbing and tapes for loose or broken
stitching.
Main Panel. Inspect for holes and tears, loose and
broken stitching
Stow Loops and Reinforcement Panel. Inspect for
loose or broken stitching, holes, tears, burns or frays.
Edge Reinforcement Webbing. Inspect for loose and
broken stitching, holes, tears, burns or frays.
Side Flaps. Inspect for loose and broken stitching,
holes, tears, burns or frays.
Locking Stow Panel. Inspect for loose and broken
stitching, holes, tears, burns or frays.
Locking Stow Loop Hoods. Inspect for loose or
broken stitching, holes, tears, burns or frays.
Suspension Line Protection Cover. Inspect for loose
or broken stitching, holes, tears, burns, frays and
illegibility of markings.
Cover Tiedown Loops. Inspect for loose or broken
stitching, holes, tears, burns or frays.
Connector Link Tie Loops. Inspect for loose or
broken stitching, holes, tears, burns or frays.
06
*
*
Standard
Static Line &
Static Line
Extension
Webbing. Inspect for loose or broken stitching,
holes, line extension tears, burns or frays.
Sleeve and Buffer. Inspect for loose or broken
stitching, holes, tears, burns or frays. Inspect entire
portion of static line covered by sleeve.
Pack Opening Loop. Inspect for loose or broken
stitching, burns, tears or frays.
