TM 10-1670-299-20&P
TO 14D1-2-470-2
NAVAIR 13-1-41
(2) Cable and conduit assembly.
(a) Removal. Unscrew push-pull actuator assembly (1) from release fasteners (2) as shown, and
withdraw assembly through quick-release retaining loop (3).
(b) Installation.
1. Position a 20 x 10 inch preformer, using a rigid wooden or paperboard box, in the top part of
the harness and secure with two "F" web straps as shown.
WARNING
Failure to correctly position release knob could result in a safety hazard. If the knob is in the up
position it could interfere with the parachutists's reserve parachute.
2. With the words "Pull to Release" on the actuator knob facing up, insert the push-pull actuator
assembly through the retaining loops in both sides of the harness and attach to release fasteners with nuts. Remove
preformer.
NOTE
When tightening the nuts, assure that the release fasteners are not twisted away from the
harness. When the nuts are fully tightened the actuator knob should be in position shown.
2-128