TM 10-1670-299-20&P
TO 14D1-2-470-2
NAVAIR 13-1-41
2-25. Container, Front Mounted
This task covers: a. Inspect
c. Replace
b. Repair
INITIAL SETUP
Tools:
Knife, Item 1, Section III, Appendix B
Shears, Item 2, Section III, Appendix B
Materials/Parts:
Cloth, duck, nylon, Item 7, Appendix D
Cord, fibrous nylon, Item 9, Appendix D
Felt, 1/4" thick, Item 12, Appendix D
Tape, textile, nylon, Item 30, Appendix D
Thread, nylon, size E, Item 36, Appendix D
Thread, nylon, size FF, Item 37, Appendix D
Thread, nylon, size 3, Item 35, Appendix D
General Safety Requirements:
Read, understand and follow all warnings, cautions and notes.
Equipment Condition :
The container should be clean and dry. Place container on work table.
INSPECT
Perform a before and after repair rigger/technical inspection of the Release Assembly as outlined in paragraph 2-14.
REPAIR
The nylon duck material of the container and attached flap assemblies may be restitched, darned, and patched. The felt
lining may be restitched and plugged. When making any of these repairs, remove stitching as necessary to gain access
to the damaged area. After repairs have been made, replace any stitching
2-152
