TM 10-1670-299-20&P
TO 14D1-2-470-2
NAVAIR 13-1-41
(4) Pocket Assembly, Lowering Line, Closure Flap Assembly, and Inner Flap Assembly. To replace these
assemblies proceed as follows:
a Cut the stitching that secures the damaged pocket (1), closure (2) and inner flap assembly (3) to the
container body (4), vertical restraint assembly (5) and the side container assembly (6).
b Remove nylon tape loop (7) from container body if damaged.
c Fabricate new pocket (1), closure flap (2), and inner flap (3) as described in Appendix E.
d Place new pocket (1), closure flap (2), and inner flap (3) onto container body (4) as shown and sew
using size FF thread, 7 to 9 stitches per inch and a type MD sewing machine.
2-159