Secure the static line (figure 16, item 1) to the deployment bag (figure 16, item 2).
2
1
Figure 16. Securing Static Line to D-bag.
2. Attach the snap hook to the Modified USL, or the USL extension as follows:
a. Position the snap hook (figure 17, item 1) so the opening gate (figure 17, item 2) is facing left.
Lay the static line (figure 17, item 3) flat on the packing table. Ensure that the green ID marking
thread (figure 17, item 4) is on top and on the outside of the loop.
1
2
3
4
Figure 17. Positioning Static Line and Snap Hook.
b. Pass the 3-inch loop end (figure 18, item 1) of the static line (figure 18, item 2) through the
opening (figure 18, item 3) in the base of the snap hook (figure 18, item 4), from bottom to top.
1
3
2
4
Figure 18. Passing Loop End of Static Line Through Base of Snap Hook.