TM 10-1670-327-23&P
0006 00
d. Continue passing the snap hook through the 3-inch loop until a taut girth hitch (figure 23, item
1) is made securing the USL extension (figure 23, item 2) to the static line (figure 23, item 3)
(there will be a half-twist in the 3-1/2-inch loop when forming the girth hitch).
1
2
3
Figure 23. Making Girth Hitch Securing USL Extension to Static Line.
END OF WORK PACKAGE