10. Conduct a continuity check in accordance with figure 7 below.
11. Top left suspension line group. Line 1 (inside top) followed in sequence by 2, 3, 4, 5 (outside top) runs
from the canopy, to the top left connector link.
12. Bottom left suspension line group. Line 6 (outside bottom) followed in sequence by 7, 8, 9, 10 (inside
bottom) runs from the canopy, to the bottom left connector link.
13. Bottom right suspension line group. Line 11 (inside bottom) followed in sequence by 12, 13, 14, 15
(outside bottom) runs from the canopy, to the bottom right connector link.
14. Top left suspension line group. Line 16 (outside top) followed in sequence by 17, 18, 19, 20 (inside
top) runs from the canopy, to the top right connector link.
Top left
5 4 3 2 1
20 19 18 17 16
Top right
o o o o o
o o o o o
Bottom left
6 7 8 9 10
11 12 13 14 15
Bottom right
o o o o o
o o o o o
Figure 7. Suspension Line Groups.
15. Using an 8-inch adjustable wrench, tighten barrel nut (figure 8, item 1) on connector links (figure 8,
item 2) until firmly seated against flange finger tight plus 1/4-turn.
16. Rotate each connector link (figure 8, item 2) sideways on the long portion of the connector link
(figure 8, item 2).
1
2
Figure 8. Rotating Connector Links.
0007 00-6