TM 10-1670-327-23&P
UNIT MAINTENANCE
MC-6 PERSONNEL PARACHUTE SYSTEM
NSN 1670-01-527-7537
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
INITIAL SETUP:
Tools
Personnel Required
None required
92R (10) Parachute Rigger
Materials/Parts
Equipment Condition
None required
All equipment shall be serviceable and ready
for use.
GENERAL
The following describe PMCS procedures on the unit and direct support levels. The PMCS table has been
provided to ensure the MC-6 is in proper operating condition, and ready for its primary mission.
Frequency of Performing PMCS. PMCS will be
performed before equipment is
packed for use, during
modification and repair after use, or at any time deemed necessary by the air delivery equipment
maintenance officer.
PMCS Columnar Entries Table 1.
Item Number. The item number column shall be used as a source of the item number required for the
TM Number column on DA Form 2404 (Equipment Inspection and Maintenance Worksheet), when
recording the results of the PMCS.
Interval. This column identifies the required PMCS interval.
Item to be inspected. Contains the common name of the item to be inspected.
Procedures. Provides a brief description of the procedures by which the checks are to be performed.
Recording Defects. All defects discovered during the inspection will be recorded using the applicable
specifics in DA PAM 750-8, DA PAM 738-751 and TB 43-0002-43.
Over Age Items. During any inspection, or at any time that an item is found to be over age (i.e.,
shelf/service-life has expired as specified in TB 43-0002-43), the item will be removed from service,
condemned, and tagged, in accordance with DA PAM 738-751.
Conservation of Resources. To conserve time and labor, and to avoid evacuation to a direct support
maintenance activity, unit/detachment commanders may designate, in writing, rigger personnel to
accomplish classification inspection of over age air delivery equipment and the classification of Beyond
Inspection Function Requirement. Normally, air delivery equipment maintenance personnel at a
packing, rigging, or repair activity will perform a technical/rigger-type inspection. The inspection of initial
receipt items will be performed as a separate function from packing or rigging activity; the item to be
inspected will be placed in proper layout on a packing table or suitable sized floor area.
0009 00-1