TM 10-1670-327-23&P
UNIT MAINTENANCE
MC-6 PERSONNEL PARACHUTE SYSTEM
NSN 1670-01-527-7537
RESERVE PARACHUTE PACKING PROCEDURES
INITIAL SETUP:
Tools
Personnel Required
92R (10) Parachute Rigger
92R (20) Parachute Rigger
Rod, Compression, Ejector Spring (Item 46, WP
Equipment Condition
Laid out on packing table or other
suitable area.
Cradle, Deployment Bag Packing (Item 13, WP
Materials/Parts
Tape, Lacing and Tying, Nylon, (Item 42, WP
Thread, Cotton, Ticket 8/4, Orange (Item 47, WP
Band, Rubber Retainer, 1-1/4-inch (Item 2, WP
Band, Rubber Retainer, 2-inch (Item 3, WP 0109
GENERAL
This work package contains the packing procedures for the T-11R Personnel Parachute.
Read all warnings and cautions within this section and follow procedures outlined herein to ensure safe
operation of the T-11R Personnel Parachute and associated equipment.
0016 00-1