TM 10-1670-277-23&P 0011 00
0011 00-28
m. Rigger check number 6.
n. Tie the running end of the pendulum line to the canopy bridle loop with 3 alternating half hitches and
an overhand knot in the running end. S-fold the excess and secure to the top of the deployment bag
bridle straps with retainer bands.
o. Tape down the V-rings with 2-inch, pressure sensitive adhesive tape.
8. Signing DA Form 3912.
a. Remove parachute log record book from parachute inspection data pocket (log record pocket) on
upper end of the deployment and record pack data as prescribed in WP 0003 00, SERVICE UPON
RECEIPT.
b. After completion of entries, return log record book to inspection data pocket.
c. Rigger check number 7.
Pendulum
Line
Bridle Loop