ARMY TM 10-1670-282-23&P
AIR FORCE T.O. 13C5-30-2
NAVY NAVAIR 13-1-33
2-40.
Static Line.
This task covers:
a.
Inspect
b.
Service
c. Repair
d.
Replace
Tools:
Personnel Required:
Sewing Machine, Industrial, Zig Zag
43E(10) Parachute Rigger
(Table 2-2)
Materials/Parts:
Equipment Condition:
Tape, Pressure Sensitive, Item 45,
Inspected (paragraph 2-13)
Appendix D
Cleaned (paragraph 2-12)
Thread, Nylon, Size E, Item 23/24,
Laid out on work table
Appendix D
Reference:
Webbing, Nylon, Tubular, 3/4-inch,
Item 46, Appendix D
Group 03, MAC, Section II, Appendix B
a.
Inspect. Refer to paragraphs 2-9 and 2-13 for inspection procedures.
b.
Service. Refer to paragraph 2-12 for cleaning procedure.
c.
Repair.
(1)
Stitching. Stitch and restitch with size E nylon thread which matches the color of the original stitching, when
possible. Lock all straight stitching by backstitching at least 1/2 inch. Restitch by overstitching each end of the stitch
formation by 1/2 inch. Restitch directly over the original stitching, following the original stitch pattern as closely as possible.
(2)
Marking and Restenciling. As required, restencil identification marks using the procedures in paragraph 2-19.
(3)
Retaping. As required, retape riser clevis attaching loop located on one end of static line length as follows:
(a)
Remove the remains of the original tape from the riser clevis attaching loop.
(b)
Using a 2 1/2-inch length of 1-inch wide, pressure-sensitive tape, serve riser clevis attaching loop with
one and a half turns (figure 2-65.1).
Change 1 2-106.1
