ARMY TM 10-1670-282-23&P
AIR FORCE T.O. 13C5-30-2
NAVY NAVAIR 13-1-33
2-41.
Static Line Clevis.
This task covers:
a.
Repair
b.
Replace
Tools:
Equipment Condition:
Knife, item 5, Appendix B
Inspected (paragraph 2-9, 2-13)
Knie, Hot Metal, Item 6, Appendix B
Cleaned (paragraph 2-12)
Yardstick, Item 25, Appendix B
Materials/Parts:
Wire, Item 38, Appendix D
Cord, Nylon, Type IA, hem 11, Appendix D
a.
Repair. Repair a static line clevis using the following procedures, as applicable.
(1)
Replacing a static line pin retaining cord.
(a) If applicable, cut and remove the original clevis pin retaining cord from the static line clevis body, the
clevis pin, and the safety pin.
(b) Cut a 16-Inch length of type I nylon cord or an equivalent type cord and sear the ends.
(c) Pass one-half of the cord length around the static line clevis body, join the cord ends, and make a square
knot snug against the clevis body (figure 2-66).
Figure 2-66. Static Line Clevis and Component.
(d)
Pass one tie running end through the top of the clevis pin and secure the tie end snug against the clevis pin
top with a square knot, leaving a 3/8-inch long running end.
(e)
Make an overhand knot in the remaining running end at a point within 3/16 inch of the square knot.
2-108
