ARMY TM 10-1670-282-23&P
AIR FORCE T.O. 13C5-30-2
NAVY NAVAIR 13-1-33
2-40.
Static Line (cont).
This task covers:
a.
Inspect
b.
Service
c. Repair
d.
Replace
Figure 2-65.1. Retaping Riser Cevis Attaching Loop
d.
Replacement. Replace an unserviceable static line by fabricating as follows:
(1)
Remove riser clevis from clevis attaching loop. Retain riser clevis for further use, if serviceable.
(2)
Cut a 192 1/2-inch length of 3/4-inch wide tubular nylon webbing and sear ends.
(3)
Place a mark 14 inches from end and make a 7-inch long foldback on one end of the webbing length (figure 2-
65.2). Beginning at seared edge, secure foldback by stitching two 3/16-inch wide by 4-inch long rows of double-throw
zigzag stitching according to details in table 2-3. Stitching will be made using specifics in table 2-3.
(4)
On opposite end of webbing length, mark 11 inches from end and make a 5 1/2-inch long foldback. Secure
foldback using procedure in (3), above.
(5)
Cut a 7 1/2 inch length of 3/4 inch wide tubular nylon webbing and sear the ends. Mark the static line 10 inches
from end of the 3 inch loop. Mark the cut length of nylon 4 inches from one end and foldback along that line. Place 3 1/2
inch side of foldback against static line with the end of the 4 inch side aligned with the 10 inch mark on the static line.
Beginning at seared edge, secure foldback by stitching two 3/16-inch wide by 2 1/2-inch long rows of double-throw zigzag
stitching according to details in Table 2-3. Stitching will be made using specifics in Table 2-3.
Change 1 2-106.2
