TM 10-1670-286-20
EXTRACTION LINE PANEL 0005 00
STOWING 60-FOOT ONE LOOP EXTRACTION LINE TO EXTRACTION LINE PANEL
0005 00-3
2. Stow extraction line.
a. Separate extraction line plies and wrap each ply with piece of 6 x 16-inch cotton muslin cloth position
over upper and lower row of stow loops (figure 2).
b. Secure wrapped plies together at each end with two turns of single ¼-inch wide type I cotton webbing.
Tie with surgeons knot and locking knot.
Figure 2. Wrapped Plies of Extraction Line Secured.
CAUTION
The extraction line must be firmly secured to the panel to prevent slippage and
damage during deployment.
c. Pass running ends of 36-inch length of ½-inch wide tubular nylon webbing previously installed on panel
up between wrapped plies of extraction line, pass each running end in opposite direction, down and under
stow loop and back to top extraction line. Secure ties with surgeons knot, locking knot, and overhand knot
in running ends.
d. Starting at center of panel, stow lower half of extraction line on right side of panel (figure 3). S-fold/stow
extraction line lengthwise on panel and secure each stow with retainer bands. Continue stowing extraction
line until approximately one foot of extraction line extends from lower right corner of panel.