TM 10-1670-327-23&P
UNIT MAINTENANCE
MC-6 PERSONNEL PARACHUTE SYSTEM
NSN 1670-01-527-7537
MAIN DEPLOYMENT BAG SIDE FLAPS
REPLACE
INITIAL SETUP:
Tools
Personnel Required
92R (10) Parachute Rigger
Materials/Parts
Equipment Condition
Lay out on packing table or other suitable area.
REPLACE
Darning Small Holes Or Tears. Darn small holes or tears in the side flaps if the holes or tears do not
exceed 3/4-inch in length or diameter. Use size E nylon thread, and 7 to 11 stitches per inch.
END OF WORK PACKAGE
0083 00-1/(2 Blank)