TM 10-1670-327-23&P
UNIT MAINTENANCE
MC-6 PERSONNEL PARACHUTE SYSTEM
NSN 1670-01-527-7537
MAIN DEPLOYMENT BAG TIE DOWN LOOP
REPLACE
INITIAL SETUP:
Tools
Personnel Required
92R (10) Parachute Rigger
Sewing Machine, Light-Duty (Item 56, WP 0097
Materials/Parts
Equipment Condition
Lay out on packing table or other suitable area.
Webbing, Nylon, Type I, 9/16-inch wide, Neutral
REPLACE
Suspension line protector cover tie-down loop (figure 1, item 1). Repair the tie-down loops that are
burned, frayed or torn over one-half of the loop, as follows:
1. Cut stitching, and remove damaged loop (figure 1, item 1).
2. Cut a 6-inch length of 9/16-inch, Type I, nylon webbing; wax ends of webbing.
3. Position the Type I webbing in the same place the damaged material was removed. Align the two
ends of the Type I webbing, with the top of the webbing reinforcement.
0086 00-1