TM 10-1670-327-23&P
UNIT MAINTENANCE
MC-6 PERSONNEL PARACHUTE SYSTEM
NSN 1670-01-527-7537
MAIN DEPLOYMENT BAG LOCKING STOW LOOP
REPAIR
INITIAL SETUP:
Tools
Personnel Required
As required
92R (10) Parachute Rigger
Materials/Parts
Equipment Condition
As required
Lay out on packing table or other suitable area.
REPAIR
Restitch locking stow loop IAW WP 0017 00.
NOTE
No other repairs are authorized for the locking stow loop.
END OF WORK PACKAGE
0085 00-1/(2 Blank)