TM 10-1670-265-12&P
T.O. 13C7-1-21
CHAPTER 4
ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
SECTION I.
REPAIR PARTS, SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
4-1. Common tools and equipment. Common tools and equipment used in the packing of the G-12E and 68-inch pilot
chute are prescribed in TM 10-1670-215-23/T.O. 13C5-1-102 and authorized by the applicable unit Table of
Organizational Equipment (TOE). Field expedient items are detailed in TM 10-1670-201-23 T.O. 13C-1-41.
4-2. Special tools, TMDE, and support equipment.
An ASPSU test set P/N FLT4240, NSN 1670-01-064-4925
provides testing of the ASPSU.
4-3. Repair parts.
Repair parts are listed and illustrated in
Appendix C of
this manual.
SECTION II. SERVICE UPON RECEIPT
4-4. Service upon receipt. Refer to TM 10-1670-215-23/T.O. 13C5-1-102 for service upon receipt of the G-12 and 68-
inch pilot chute. Instructions for the ASPSU are provided as follows:
4-5. Unpacking. Remove and discard packing from ASPSU.
4-6. Checking unpacked equipment.
a. Inspect the ASPSU for damage incurred during shipment. If the ASPSU has been damaged, report the damage
on DD Form 6, Packing Improvement Report.
b. Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies in
accordance with the instructions of TM 38-750.
4-7. Deprocessing unpacked equipment. Not required for the ASPSU.
4-1