TM 10-1670-265-12&P
T.O. 13C7-1-21
SECTION III. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
4-9. All PMCS required for the ASPSU are listed in
Table 2-2. PMCS for the G-12E and the 68-inch pilot chute are
listed in TM 10-1670-215-23/T.O. 13C5-1-102 and the high altitude container PMCS are listed in TM 10-1670-240-
20/T.O. 13C7-49-11.
SECTION IV. TROUBLESHOOTING
4-10. Troubleshooting does not apply to the HAARS System. Maintenance tests and adjustments are performed using
the ASPSU test set P/N FLT4240 prior to the rigging of the HAARS. If adjustment cannot be accomplished, turn the unit
into supply as unserviceable and obtain a serviceable unit.
SECTION V. MAINTENANCE PROCEDURES
4-11. Maintenance procedures.
a. Scope. This section contains maintenance procedures which are the responsibility of the organizational
technician as authorized by the maintenance allocation chart (MAC) and the Source, Maintenance and Recoverability
(SMR) coded items; that are identified in the repair parts and special tools list (RPSTL).
b. Maintenance functions/procedures. Each paragraph identifies the maintenance function specified in the MAC.
All maintenance procedures required to complete a maintenance function are identified under "This task covers:", in the
order in which the work is most logically accomplished.
c. Parachute maintenance. Maintenance procedures for the G-12E and the 68-inch pilot chute are provided in TM
10-1670-215-23/T.O. 13C5-1-102.
4-3/(4-4 blank)