TM 10-1670-268-20&P 0012 00
UNIT MAINTENANCE
TYPE V AND DUAL ROW AIRDROP PLATFORM
SIDE RAIL
0012 00-1
THIS WORK PACKAGE COVERS:
Remove
Clean
Inspect
Install
INITIAL SETUP:
Tools:
Brush, Wire (Item 2, WP 0020 00)
Cord, Extension (Item 3, WP 0020 00)
File, Mill (Item 7/8 WP 0020 00)
Punch, Aligning (Item 15, WP 0020 00)
Socket, 3/4IN. (Item 17, WP 0020 00)
Socket, 9/16IN. (Item 19, WP 0020 00)
Wrench, Box and Open, ¾-IN. (Item 23, WP 0020 00)
Wrench, Box and Open, 9/16-IN. (Item 28, WP 0020 00)
Wrench, Impact, ½-IN. Drive (Item 30, WP 0020 00)
Materials/Parts:
Brush, Scrub (Item 1, WP 0036 00)
Dishwashing Compound (Item 3, WP 0036 00)
Rag, Wiping (Item 5, WP 0036 00)
Replacement parts from stock, as required.
Applicable Configurations:
All
Personnel Required:
Two Three 92R (10) Parachute
Rigger
General Safety Instructions:
Observe all Warnings and
Cautions.
Special Tools:
Forklift
3Foot Suspension Sling
REMOVE
NOTE
The platform will be positioned bottom side up on the supporting
materials.
Remove side rails as follows:
(Refer to illustration at the end of the REMOVE procedure.)
1. If applicable, remove platform clevises, tandem links, suspension brackets, EFTA brackets and
outrigger assemblies IAW each applicable work package.
NOTE
The number of side rail (hex head) bolts (2), flat washers (3), and
side rail bushings (6) will vary depending on the length of the
platform. Refer to Table 1 at the end of this work package for
required quantities.