TM 10-1670-268-20&P 0012 00 0012 00-3 CLEANING1. Remove dirt, grease, and foreign material, using plain water or a solution of detergent and water. Rinse with clean water. 2. Wipe dry with clean cloth. 3. Remove burrs by filing. 4. Remove corrosion with a wire brush. INSPECTION Inspect for wear, cracks, excessive corrosion, bends and bows. REPLACEMENT Replace parts that show any of the defects identified in INSPECTION above. INSTALLATION Install side rail as follows: (Refer to illustration on following page.) 1. Select side rail(1) the same length as the platform. 2. Position side rail (1) along side of platform, overlapping roller pad. NOTE Do not hammer bolts to start them when attaching the side rail. 3. Install the side rail/out board roller pad bolts (2) and flat washers (3). Start each bolt two or three turns by hand, and then using either a 9/16-inch wrench or socket tighten to within one-quarter inch. NOTE When replacing the side rail for the type V platform, refer to the specific rigging manual for the placement of the suspension bracket assembly. For tandem link assemblies, omit the last three side rail bushings on each end of side rail. NOTE When replacing the side rail for the dual row platform, install side rail bolts, washers and bushings in holes 1-30 ONLY at this time. This allows for the installation of the outrigger link at a later time.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business