TM 10-1670-268-20&P 0013 00
UNIT MAINTENANCE
TYPE V AND DUAL ROW AIRDROP PLATFORM
ROLLER PAD
0013 00-1
THIS WORK PACKAGE COVERS:
Remove
Clean
Inspect
Install
INITIAL SETUP:
Tools:
Brush, Wire (Item 2, WP 0020 00)
File, Mill (Item 7/8, WP 0020 00)
Punch, Aligning (Item 15, WP 0020 00)
Socket, ¾IN. (Item 17, WP 0020 00)
Socket, 9/16IN. (Item 19, WP 0020 00)
Wrench, Box and Open, ¾IN. (Item 23, WP 0020 00)
Wrench, Box and Open, 9/16IN. (Item 28, WP 0020 00)
Wrench, Impact, ½-IN. Drive (Item 30, WP 0020 00)
Materials/Parts:
Brush, Scrub (Item 1, WP 0036 00)
Dishwashing Compound (Item 3, WP 0036 00)
Rag, Wiping (Item 5, WP 0036 00)
Replacement parts from stock, as required.
Applicable Configurations:
All
Personnel Required:
Two Three 92R (10) Parachute
Rigger
General Safety Instructions:
Observe all Warnings and Cautions.
REMOVE
Remove roller pad as follows:
NOTE
To remove the outboard roller pads, the side rail must be loosened
and retightened IAW WP 0012 00.
1. If removing an outboard roller pad, loosen side rail bolts ¼-inch using a ¾-inch wrench or socket.
2. Using either a 9/16-inch wrench or socket, remove bolts (1) and flat washers (2) securing the roller pad
(3) to platform.
NOTE
The number of bolts and washers will vary depending on the size of
the platform.
1
2
3