TM 10-1670-201-23
T.O. 13C-1-41
NAVAIR 13-1-17
pin and baste each folded edge to complete area
preparation. Basting will be performed according to
(8) Position a piece of serviceable cloth equal
to the material used in original gore section construction
over the prepared area with the warp and filling of the
cloth piece alined with the warp and filling of the original
section material.
(9) Cut the cloth piece to a size that will cover
the entire prepared area. Allow as many selvaged
edges of the cloth piece to remain as possible. Also
allow at least 3 inches of extra fabric to remain on each
raw edge.
(10) Fold under each selvaged edge of the
cloth piece to a width equal to the width of adjacent
seams and aline the cloth folded edges with the outside
edges of adjacent seams or bands. Secure the folded
edges to the seams or bands with pushpins.
(11) Fold the raw edges of the cloth piece as
follows:
(a) Fold under the raw edges located
adjacent to edge reinforcements and a lateral band, as
applicable, and aline the folded edges with the outside
edges of the reinforcements or band. Secure the alined
edges to the applicable reinforcements or lateral band
with pushpins.
(b) Fold under the raw edges located
along radial seams which have four rows of stitching
and aline the folded edges with the center of the radial
seams. Secure the folded edges to the radial seams
with pushpins.
(c) Fold under the raw edges located
along radial seams which have two rows of stitching and
aline the folded edges with the outside edges of the
radial seams. Secure the folded edges to the radial
seams with pushpins.
(12) Secure the situated replacement section
cloth to the canopy material by basting along each of
the folded edges. Basting will be made according to the
(13) Remove the pushpins from the edges of
the replacement section and secure the section material
to the canopy inside by stitching according to the details
Stitching will be made using the
Figure 3-16. Normal gore section replacement
in the applicable item equipment publication.
details, typical (sheet 2 of 2)
(14) Turn the canopy right side out and trim
(5) Remove the damaged section by, cutting
the raw edges of the section material to a point 1/2 inch
the section material at a point 1/2 inch in from the inside
from the stitching made in (13) above.
edge of each adjacent seam, lateral band, or edge
reinforcement.
(6) Cut the remaining fabric diagonally at
each corner to allow the raw edges to be folded back.
(7) Fold each raw edge back by 1/2 inch and
3-31