EXTRACTION LINE PANEL PROCEDURES FOR C-17 GLOBEMASTER III 0015 00
STOWING 160-FOOT ONE LOOP EXTRACTION LINE TO EXTRACTION LINE
PANEL WITH EXTRACTION BRIDLE ATTACHED
0015 00-12
7. Replace Breakcord Tie.
a. Remove the temporary canopy breakcord tie installed during packing of parachute.
b. Cut an 18-inch length of type I, ¼-inch cotton webbing for use in replacing canopy breakcord tie.
c. Pass the type I, ¼-inch cotton webbing one turn double, through canopy bridle loop, around
deployment bag bridle loop straps and through both connector links. Secure tie with surgeons knot
and locking knot (figure 13).
Figure 13. 15 Extraction Parachute Secured to Extraction Line Bag.
8. Install Lanyard and Safety Ties.
NOTE
Install Deployment Bag Figure Eight Safety Tie IAW WP 0012 00.
a. Cut a 60-inch length of ½-inch tubular nylon used as a parachute deployment bag, cutter knife
lanyard.
Strap Handle
(Bottom Panel)
V-Ring
Tie
Deployment Bag
Bottom Securing Loop
Canopy Breakcord Tie
Parachute Attaching Webs
