EXTRACTION LINE PANEL PROCEDURES FOR C-17 GLOBEMASTER III 0015 00
STOWING 160-FOOT ONE LOOP EXTRACTION LINE TO EXTRACTION LINE
PANEL WITH EXTRACTION BRIDLE ATTACHED
0015 00-14
f. Safety the two-point link to the closing loops (centered between bag closing loops) with the two
lengths of ½-inch tubular nylon. Pass one length around adapter web attaching bolt on the two-point
link and through top left bag-closing loop. Pass the second length around the adapter web-attaching
bolt on the two-point link and through top right bag closing loop. Secure with surgeons knot, locking
knot, and an overhand knot in the running end (figure 15).
g. Cut a 24-inch length of type I, ¼-inch cotton webbing, double and secure extraction line to top
right deployment bag tie loop with a surgeons knot locking knot (figure 15).
Figure 15. Safety Ties Installed.
END OF WORK PACKAGE