EXTRACTION LINE PANEL PROCEDURES FOR C-17 GLOBEMASTER III 0015 00
STOWING 160-FOOT ONE LOOP EXTRACTION LINE TO EXTRACTION LINE
PANEL WITH EXTRACTION BRIDLE ATTACHED
0015 00-10
f. Beginning at the upper top center bridle attaching loops, pass one end of a 95-inch type I, ¼-inch
cotton webbing closing tie (temporary handling tie) through the top center, bottom right, top right,
bottom center, top left, bottom left, and back through top center loops. Remove slack from tie and
secure ends with a surgeons knot and locking knot (figure 11).
NOTE
Temporary handling tie is for handling and transport only. Remove aboard
the aircraft.
g. Fold and secure running ends of extraction line to carrying handles using a suitable length of type
I, ¼-inch cotton webbing.
h. Attach a data tag to completed Extraction Line Bag. Data tag will identify the person who stowed
it, date stowed, length, and the number of loops.
Figure 11. Temporary Handling Tie.
10 IN Closing Tie
(3 EA Side)
95 IN Bag Closing Tie
(Temporary Handling Tie)
Data Tag
